日本一区二区三区免费视频_亚洲国产区男人本色_亚洲精品无码久久久久久久_国产日韩一区二区三区在线观看_久久婷婷人人澡人人喊人人爽



Acceptance key points of UV air spraying automatic coating line
Time:2012-10-22 14:02:30

       At present, many companies use UV air spray automatic coating line (line), how to accept the UV automatic coating line is worth discussing. Let me start with a few points:


       1. Whether the line is running smoothly;

       2. Whether the exhaust air system is normal (such as the monitoring of wind direction and velocity between each tuyere and each region, etc., and the design of exhaust air pipe is reasonable);

       3. Whether the cleanliness, temperature and humidity of each area are up to standard and controllable;

       4. Whether the temperature of preheating and baking is within a reasonable range and controllable;

       5. Confirmation of spray gun and UV lamp (number and type, etc., whether the UV energy is up to standard and controllable);

       6. Whether the coating is thorough and excessive in UV curing;

       7. Whether the yield rate of the products tested is qualified.

Service hotline

020-36860788

WeChat

Feedback

Feedback